Layout confirmation
Check the owner-approved drawing against hoop positions, available area and measured site references.
Sports line-marking planning in Singapore
Basketball markings depend on the approved ruleset, court orientation, hoop positions and available playing area. Dedicated, half-court and multi-sport layouts should not be assumed from a generic drawing; the required layout and fixed site references must be agreed first.
Site conditions and the final layout must be confirmed before materials, line positions and work sequencing are agreed.
Check the owner-approved drawing against hoop positions, available area and measured site references.
Confirm cleaning, old-line treatment and any separate repair or resurfacing needs.
Measure and mask the approved line system before applying compatible materials.
Check line continuity and protect the surface until the specified cure conditions are satisfied.
Existing lines can be used as a reference only after their layout, alignment and condition are checked. If the required layout has changed, the new approved drawing should control the work.
A multi-sport layout may be possible. The owner should approve the combined layout and colour hierarchy after the available area, fixed equipment and line conflicts are reviewed.
No. Product requirements, coat build, surface temperature, humidity, rain risk and moisture all affect drying and cure. The court remains closed until the specified conditions are achieved.
Include the venue, photos, current surface condition, intended sport or event layout, available drawings and target access dates.